Time: 17:30(JST) -
Site: KEK ATF LC container
Participants: Tauchi, Terunuma, Okugi, Kuroda, Naito, Yamanaka, Kamiya(WebEx), Oroku(WebEx)
* Plan to enlarge the present IP laser hut to contain a new IP-BSM laser
- Power supply: Current one can be used by switching
- Cooling water: No additional chiller
inspect whether the present chiller can be used for both lasers
- Optical table: Bigger table can be used.
- After the expansion of the laser hut, it is inevitable to share the same
laser hut with MONALISA group.
- It is desired to separate the laser hut. (prepare a setup to divide the hut)
* Decision of Beam Optics
- Beam current: higher is better
- Repetition rate: faster is better
Naito-san will try to prepare the hardware for 3 Hz operation.
- Horizontal beam size: don't want to focus further (last time: sigma_x = 10 um)
It was observed the background become larger during Q-scan using QD0
- Vertical beam size:
- At first, 4..58 deg crossing angle, 6.7 um fringe pitch will be used in the
interference mode
- to observe the fringe pattern by the Compton photon signal, less than 1 um
beam size is desired.
* New laser
- specification of the laser is fixed.
- it will be delivered to KEK end of September.