ATF2 weekly meeting
→
Asia/Tokyo
-
-
14:30
→
15:30
International phone/webex meeting
- 14:30
-
14:50
Schedule plan of machine studies in October to December 40mSpeakers: Philip Bambade (Laboratoire de l''Accelerateur Lineaire (LAL) (IN2P3) (LAL)), Dr Toshiyuki Okugi (KEK)
-
15:30
→
16:30
KEK site meeting (Japanese)
-
15:30
Progress of Shintake monitor work 20mSpeakers: Mr Masahiro OROKU (Tokyo Univ.), Mr Takashi Yamanaka (The University of Tokyo)Participants: Terunuma, Tauchi, Okugi, Yamanaka, Oroku, Kamiya(WebEx) Time: 17:00 ~ 18:00 Site: KEK ATF LC Container Q: Is it possible to move a new Cherenkov detector remotely? A: Yes, it is not impossible. However, since it is heavy, it may be difficult with devices in hand. Furthermore it is uncertain whether continue to use a Chenkov detector. Q: How long is the stroke of the collimator scanning stage? A: 100 mm in horizontal and 50 mm in vertical. They are enough. C: Cause of the laser position drift may be air temperature rather than laser cooling water. When air temperature changes, the support of the mirrors deforms and laser path changes. C: Stabilization of the laser path will be needed to suppress the position drift.
-
15:30
-
14:30
→
15:30