ATF2 weekly meeting

Asia/Tokyo
Minutes ( draft, correction on red, 9/22)
    • International phone/webex meeting
      • 1
        Specification/parameters of SC Q and cryogenics (20 min+50min for discussion)
        Speaker: Dr Brett Parker (BNL)
        Slides
      • 2
        Subjects for SC FF magnet system
 at ATF2
        Speaker: Mr Nobuhiro Kimura (KEK)
        Slides
      • 3
        Phase stability in the QBPM system
        Speaker: Dr Stewart Boogert (Royal Holloway, University of London)
        Slides
      • 4
        Emittance reduction by a SC wiggler in the ATF-DR
        Speaker: Dr Yannis PAPAPHILIPPOU (CERN)
        Slides
    • KEK site meeting (Japanese)
      • 5
        Progress of Shintake monitor work
        Speakers: Mr Masahiro OROKU (Tokyo Univ.), Mr Takashi Yamanaka (The University of Tokyo)
        Slides
        Site: KEK ATF LC Container Time: 16:00(JST) ~ Participants: T. Tauchi, N. Terunuma, J. Urakawa, T. Okugi, S. Kuroda, K. Kubo, P. Bambade, S. Boogert, A. Aryshev, T. Yamanaka, Y. Kamiya(WebEX) * Modification of the IP target insertion stage C: Support of the stage using screws should be three. Micrometers won't be able to bear the preassure from vacuum * Detector Interlock C: When the PMT signals are used to interlock the HV to the detector, You should use a discriminator rather than charge ADC reading. If the gate signal to the ADC is not adjusted, it is probable to miss the high current signal. Q: If the local machine is stopped by some troubles, HV state cannot be changed and screen monitors cannot be inserted? A: In this case, they can be movable by changing the EPICS record forcibly. C: In practice, PLC should be used instead of a PC to make the system reliable. Q: How long does it take to stabilize HV after swtching on? A: If the HV is not so high, it takes 5 minitues or so. C: If screen monitors and wire scanners are used often, that period becomes a waste of time. If you can prepare a movable lead block, it will be better than HV interlock. (HV interlock should be also prepared.) * Laser Replacement C: Is one day enough to set up a new laser? If a company can make it, you should prepare plenty of time (from the afternoon of September 24) for laser set up.