Second ATF2 Project Meeting

Asia/Tokyo
Meeting room, 1F, 3-gokan (KEK)

Meeting room, 1F, 3-gokan

KEK

Tsukuba, Japan
Description
We will review the status and discuss the planning details for ATF2 in 2006. The first meeting was held at SLAC, 3-5 February 2006, whose homepage is http://www-project.slac.stanford.edu/ilc/meetings/workshops/ATF2/feb2006/ . General information on ATF and ATF2 is available at http://atf.kek.jp/index_skip.html and http://atf.kek.jp/collab/md/projects/project_atf2.php .
    • 09:00 09:30
      Registration
    • 09:30 09:40
      Greeting by J. Urakawa 10m
      Slides
    • 09:30 10:00
      Introduction
    • 09:40 10:00
      Overview and meeting plan by T.Tauchi and A. Seryi 20m
      Slides
    • 10:00 10:40
      Final optimization of optics by M.Woodley 40m
      Slides
    • 10:00 12:00
      Optics and Layout

      Finalization of the optics, layout including conventional facilities

    • 10:40 10:50
      Summary of tolerances for magnets by S.Kuroda 10m
      Slides
    • 10:50 11:30
      Layout and conventional facility by J.Urakawa and N.Terunuma 40m
      Slides
    • 11:30 11:40
      Optimization of the band width by A.Seryi 10m
      Slides
    • 11:40 12:00
      Discussion 20m
    • 12:00 13:30
      Lunch
    • 13:30 13:50
      CLIC table for the FD system by P.Bambade 20m
      Slides
    • 13:30 15:30
      IP configuration
    • 13:50 14:10
      IP Layout by T.Okugi 20m
      magnet configuration, QBPMs, beam pipe, movers
      Slides
    • 14:10 14:30
      Active supports for the FD system and Shintake monitor by R. Sugahara 20m
      Slides
    • 14:30 14:50
      Passive support for Shintake monitor by T. Kume 20m
      Slides
    • 14:50 15:10
      Stabilization between the above two ( by StaFF ), by D.Urner 20m
      Slides
    • 15:10 15:30
      Discussion 20m
    • 15:30 16:00
      coffee break
    • 16:00 16:30
      Design of Magnets: FD, Bends, Sextupoles , by C.Spencer 30m
    • 16:00 18:10
      Production and Installation Policy (1)

      Magnet and support session,
      BPM session

    • 16:30 16:50
      Field measurement of QEA magnets, by M.Masuzawa 20m
      Slides
    • 16:50 17:10
      Magnet support system, by R.Sugahara 20m
    • 17:10 17:30
      Vibration measurement of FFTB movers, by H.Yamaoka 20m
      Slides
    • 17:30 17:50
      QBPM and IP-BPM, by Y.Honda 20m
      Slides
    • 17:50 18:10
      Electronics, by M.Ross 20m
    • 09:00 11:00
      Commissioning detailed plan
    • 09:00 11:00
      Hardwares for the commisioning by T. Okugi 2h
      discussion
      Slides
    • 11:00 11:20
      coffee break
    • 11:20 12:20
      Production and Installation Policy (2)

      Power supply session by P.Bellomo, M.Kumada

    • 11:20 11:50
      Specification of bulk power supply, module and controller etc. by P.Bellomo 30m
      Slides
    • 11:50 12:20
      Role sharing between KEK and SLAC , by M.Kumada 30m
      Slides
    • 12:20 13:30
      Lunch
    • 13:30 14:00
      Laser facility for photon collider by T.Takahashi 30m
      Slides
    • 13:30 15:50
      Production and Installation Policy (3)

      Laser, feedback/feedforward session by T.Takahashi,G.Blair,P.Burrows,T.Suehara, Y.Honda

    • 14:00 14:30
      Fast feedback(FONT) and feedforward system by P.Burrows 30m
    • 14:30 15:00
      Laserwire system by D.Howell 30m
      Slides
    • 15:00 15:30
    • 15:30 15:50
      Resonant cavity type monitor for future option by Y.Honda 20m
      Slides
    • 15:50 16:10
      coffee break
    • 16:10 16:25
      Feeback and feedforward systems by P. Burrows 15m
      Slides
    • 16:10 18:10
      Scheduling strategy

      for installation of monitors and feedback/forward system etc.

    • 16:25 16:40
      Fast kicker for the ILC bunch train structure by T. Naito 15m
      Slides
    • 16:40 16:55
      Laser-wire by G.Blair 15m
      Slides
    • 16:55 17:10
      Shintake System by T.Suehara 15m
      Slides
    • 17:10 17:25
      IP-BPM and BSM with laser cavity by Y. Honda 15m
      Slides
    • 17:25 18:10
      Discussion 45m
    • 18:10 20:10
      Banquet

      Japanese food, at Cranberry restaurant, KEK

    • 09:00 11:00
      ATF operation during construction and extraction line modifications
    • 09:00 11:00
      R&D program at ATF during the ATF2 construction, by P.Burrows 2h
      Discussion, may need agreement - proposal to the ICB?, Vancouver, July 2006?
      Slides
    • 09:45 09:50
    • 09:50 09:55
      Cavity BPM by Y. Honda 5m
      Slides
    • 09:55 10:00
      MonALiSA by D.Urner 5m
      Slides
    • 10:00 10:05
      Compton laser cavity, by T.Omori 5m
    • 10:05 10:10
      ODR by P.Karataev 5m
      Slides
    • 11:00 11:05
      Magnet and Support, by C.Spencer, R.Sugahara (M.Ross) 5m
    • 11:00 12:00
      Summary
    • 11:00 12:00
      convened by A.Seryi 1h
      Brief summaries are requested to the session conveners.
    • 11:05 11:10
      Powe Supply, P.Bellomo, M.Kumada (M.Ross) 5m
    • 11:10 11:15
      Laser, feedback/feedforward, by Y.Honda (M.Ross) 5m
      Slides
    • 11:15 11:20
      Optics and Layout, by A.Seryi 5m
    • 11:20 11:25
      IP configuration, by P.Bambade 5m
      Slides
    • 11:25 11:30
      Commissionng Detailed Plan, by T.Okugi 5m
      Slides
    • 11:30 11:35
      Scheduling Strategy, by G.Blair 5m
    • 11:35 11:40
      ATF operation during construction and extraction line modifications, by P.Burrows 5m
      Slides
    • 11:40 11:45
      Production and Installation Policy Session by M.Ross 5m
      Slides
    • 12:00 13:30
      Lunch
    • 13:30 15:30
      Closed session on budgets

      KEK, SLAC, EU, K.Yokoya,J.Urakawa,T.Tauchi,A.Seryi,G.Blair,P.Bambade, etc.