3–4 Apr 2013
KEK, Building-2, the 1st floor
Asia/Tokyo timezone

Damping Ring performance

3 Apr 2013, 09:40
1h 30m
Large meeting room (KEK, Building-2, the 1st floor)

Large meeting room

KEK, Building-2, the 1st floor

1-1 Oho, Tsukuba, Ibaraki 305-0801 Japan

Description

- Including extraction line and low-emittance tuning. ATF/ATF2 alignment and stability.

Presentation materials

There are no materials yet.

Subcontributions