Choose timezone
Your profile timezone:
This Mini-Workshop is dedicated to discussions on the detector driven infrastructure needs for the ILC campus at the IP and at the central lab. Topics to be discussed include:
Latest news on the IP area, results from test drillings, adaptations of the surface infrastructure to the new site;
Requirements from ILD and SiD for surface infrastructure: assembly and buffer space, cranes, transportation;
Detector assembly plans with interdependencies on required infrastructures;
Common cryogenic facilities;
Requirements for central lab;
Review of handshake points between SiD and ILD: magnetic stray field limits, crane usage, cryo, etc.