HLRF Technical System Weekly Meeting

US/Pacific
SLAC: SCS 115, 3-5PM PDT (High Level RF TS Review)

SLAC: SCS 115, 3-5PM PDT

High Level RF TS Review

Description
1. Review status of major HLRF subsystem, components in Baseline Conceptual Design. 2. Review progress of RDR Cost Modeling and Estimates, resource assignments, standard methodologies. 3. Review R&D progress for Alternate Conceptual Designs.
    • 03:00 03:10
      Agenda & Goals 10m
      Speaker: Raymond Larsen (SLAC)
      document
      pictures
      Slides
    • 03:10 03:20
      KEK Progress 10m
      Speaker: Dr Shigeki Fukuda (KEK)
    • 03:20 03:30
      Main Linac & Klystron Status 10m
      Speaker: Chris Adolphsen (SLAC)
    • 03:30 03:40
      Distribution System Progress 10m
      Speaker: Dr Chris Nantista (SLAC)
    • 03:40 03:50
      Waveguide 3D Modeling 10m
      Speaker: Jerry Leibfritz
    • 03:50 04:00
      Distribution Costs 10m
      Speaker: Mike Neubauer (SLAC)
    • 04:00 04:10
      Modulator Progress 10m
      Speakers: Chris Jensen (FNAL), Clay Corvin (SLAC)
    • 04:10 04:20
      Controls/Interlocks/Protection Status 10m
      Speaker: Richard Cassel (SLAC)
    • 04:20 04:30
      Racks & Cooling 10m
      Speaker: Robert Downing (SLAC)
      Slides