34 / 34
- Karl Bane (SLAC)
-
Michael Borland
(ANL)
- Author in Integrated Modeling of Damping Rings
- Author in Integrated Modeling of Damping Rings
-
Craig Burkhart
(SLAC)
- Author in Inductive adder pulser
- Author in Plans for SLAC/LLNL
- Christine Celata (LBNL)
-
Stefano de Santis
(LBNL)
- Author in Kicker R&D at LBNL
-
Vladimir Efanov
(FID Technology)
- Author in FID Pulsers
- Louis Emery (ANL)
-
Gollin George
(UIUC)
- Author in Plans for UIUC/FNAL/Cornell
- Kathy Harkay (ANL)
-
Sam Heifets
(SLAC)
- Author in Tracking code for microwave instability
- Anatoly Krasnykh (SLAC)
- Bob Macek (LANL)
-
Fabio Marcellini
(INFN-LNF)
- Author in Kicker R&D at Frascati
- Author in Plans for LNF
-
Thomas Mattison
(UBC)
- Author in Alternative injection/extraction configuration
- Author in How parameters drive the kickers and septa
- Author in Kicker R&D at TRIUMF
- Author in Kicker R&D at TRIUMF and other possible technologies
-
Robert Meller
(Cornell)
- Author in Kicker R&D at Cornell/UIUC/FNAL
- Art Molvik (LBNL)
- Cho Ng (SLAC)
- Kazuhito Ohmi (KEK)
-
Mark Palmer
(Cornell University LEPP)
- Author in CesrTF
-
Mauro Pivi
(SLAC)
- Author in Discussions on e-cloud R&D plan
- Author in Electron cloud studies at SLAC
- Ina Reichel (LBNL)
-
David Rice
(Cornell)
- Author in Recent electron cloud studies at CESR
-
David Rubin
(Cornell)
- Author in RF-separated bypass
-
Giovanni Rumolo
(CERN)
- Author in Summary of CERN e-cloud activity for ILC
- Levi Schachter (Cornell)
-
Gennady Stupakov
(SLAC)
- Author in A new solver for microwave instability
-
Yusuke Suetsugu
(KEK)
- Author in Electron cloud instability experiments at KEKB
- Author in New structure for a collimator with low impedance
- Author in Utilization of KEKB for ILC R&D
- Junji Urakawa (KEK)
- Marco Venturini (LBNL)
- Lanfa Wang (SLAC)
-
Ferdinand Willeke
(DESY)
- Author in HERA-DR
-
Andrzej Wolski
(LBNL)
- Author in Discussions on impedance R&D plan
- Author in Introduction: Damping Rings R&D Status
- Aimin Xiao (ANL)
-
Michael Zisman
(LBNL)
- Author in Discussions on fast kickers R&D plan