Registration fee 1,000yen and Banquet (Forget-The-Year Party) fee about 5,000yen
Detailed floor plan ( entrances, power supply system, electronics for instrumentation and laser huts );
Re-configuration of ATF extraction line
the final v3.7 optics and answers from the homework issues;
Minimal device-configuration for the commissioning, October 2007;
- vacuum system, spaces for hardware, interfaces (to ATF control system) and responsibilities
- remote participation
QBPM system ( installation, electronics ) including s-band BPM;
FONT, Feedforward and ZC systems;
LW system;
New Shintake monitor (BSM), IPBPM and gamma detector;
IP-BPM;
Nano pattern target at IP
Status of new dipoles, new sextupoles and modification of QC3s for FD, including magnetic field measurements;
Status of magnet support systems and their installation;
Recent measurements of magnet vibrations at ATF2;
Status of the magnet movers.
Power Supply Status and Commissioning Schedule;
Magnetic field stability issue
LAPP table with "QC3" magnets and initial alignment
Rigid support for BSM and initial alignment
Monalisa system
Magnet, vacuum system, utility
Instrumentation
- FONT; FB, FF and ZC systems, nBPM- and IPBPM-triplets, Laser-wire
- MonaLisa, Stable FD Table, new Shintake monitor, Carbon wire scanner, Honda monitor