Fifth ATF2 Project Meeting
Seminar Hall, 3-Go-Kan
KEK
-
-
Registration at the meeting room Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
Registration fee 1,000yen and Banquet (Forget-The-Year Party) fee about 5,000yen
-
Conventional facilities and construction schedule Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
Detailed floor plan ( entrances, power supply system, electronics for instrumentation and laser huts );
Re-configuration of ATF extraction line- 3
-
10:40
coffee break Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
-
Hardware/devices for commissioning Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
the final v3.7 optics and answers from the homework issues;
Minimal device-configuration for the commissioning, October 2007;
- vacuum system, spaces for hardware, interfaces (to ATF control system) and responsibilities
- remote participation- 4
- 5
- 6
- 7
-
12:00
lunch Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
-
Commissioning and Tuning (1) Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
- 8
- 9
-
10
Orbit Control and beam-based feedback in EXT and FFS StudiesSpeaker: Dr Glen White (SLAC)
- 11
- 12
-
13
DiscussionSpeaker: All
-
15:30
coffee break Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
-
Instrumentation Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
QBPM system ( installation, electronics ) including s-band BPM;
FONT, Feedforward and ZC systems;
LW system;
New Shintake monitor (BSM), IPBPM and gamma detector;
IP-BPM;
Nano pattern target at IP- 14
- 15
-
16
S-Band BPM ProgressSummary of recent development and tests of S-Band BPM and electronicsSpeaker: Dr Stewart Boogert (Royal Holloway, University of London)
- 17
- 18
- 19
- 20
-
21
Shintake BSM and gamma detectorDiscussion of testing and planning for Shintake monitor in ATF2; including discussion of gamma detectorsSpeakers: Mr Masahiro OROKU (postgraduate), Mr Takashi Yamanaka (The University of Tokyo), Dr Yosuke Honda (KEK)
- 22
- 23
-
-
-
Magnets, movers and magnet installation Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
Status of new dipoles, new sextupoles and modification of QC3s for FD, including magnetic field measurements;
Status of magnet support systems and their installation;
Recent measurements of magnet vibrations at ATF2;
Status of the magnet movers.- 24
- 25
- 26
- 27
-
28
Discussion about installation schedule for all magnets & their supports & moversFurther discussions about schedules for the completion of magnet fabrication; measurements; transportation of magnets between SLAC, LAPP, KEK; installation in beamline scheduling; coordination with power supplies installation.
-
11:00
coffee break Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
-
Power supply Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
Power Supply Status and Commissioning Schedule;
Magnetic field stability issue- 29
- 30
-
12:00
lunch Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
-
ATF/ATF2 tour Seminar Hall, 3-Go-Kan (Assembly hall)
Seminar Hall, 3-Go-Kan
Assembly hall
-
Commissioning and Tuning (2) Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
- 31
- 32
- 33
-
34
Discussion
-
15:30
coffee break Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
-
FD support system Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
LAPP table with "QC3" magnets and initial alignment
Rigid support for BSM and initial alignment
Monalisa system- 35
- 36
- 37
-
38
Discussion
-
-
-
Installation Schedule Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
Magnet, vacuum system, utility
Instrumentation
- FONT; FB, FF and ZC systems, nBPM- and IPBPM-triplets, Laser-wire
- MonaLisa, Stable FD Table, new Shintake monitor, Carbon wire scanner, Honda monitor- 39
- 40
- 41
- 42
- 43
-
44
S-band BPM electronicsSpeaker: Dr Stewart Boogert (Royal Holloway, University of London)
- 45
- 46
- 47
-
11:00
coffee break Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
- 51
-
11:05
coffee break Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
-
Summary Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
- 52
-
53
Hardware devices for commissioningSpeaker: Mark Woodley (SLAC)
- 54
- 55
- 56
- 57
- 58
- 59
- 60
-
12:10
lunch Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
-
18:00
Banquet ( Forget-The-Year Party ) Seminar Hall, 3-Go-Kan
Seminar Hall, 3-Go-Kan
KEK
-