  • Thursday, 27 September
    • Introduction, Test Facilities and ACD Time Lines
      • 5
        Introduction
        Discuss time line for delivering the EDR, cutoff dates for changes (including ACD), cost and schedule responsibilities and interactions among ML groups and with other high level groups
        Speaker: Akira Yamamoto
        Slides
      • 6
        Observations from the KOM Meetings So Far
        Speaker: Nick Walker
        Slides
      • 7
        What the ILCTA@NML and STF will NOT Tell Us for the EDR by 2011
        Speaker: Sergei Nagaitsev
        Slides
      • 8
        What XFEL Will Tell Us for the EDR by 2011
        Speaker: Hans Weise
        Slides
      • 10:10
        Coffee Break
      • 9
        ACD Down-Select Criteria and Time Scales for HLRF
        Speaker: Shigeki Fukuda
        Slides
      • 10
        ACD Down-Select Criteria and Time Scales for Cavity Shapes and Processing
        Speaker: Lutz Lilje
        Slides
      • 11
        ACD Down-Select Criteria and Time Scales for Cavity Assembly and Peripherals
        Speaker: Hitoshi Hayano
        Slides
      • 12
        ACD Down-Select Criteria and Time Scales for Cryomodules
        Speaker: Harry Carter
        Slides
    • Lunch
  • Friday, 28 September
    • Integration Issues

      This session is to allow people to present issues than span technical groups, including CFS and LLRF

      • 13
        Wakes and Cavity Design
        Includes proposal for reducing wake offsets due to asymmetric antennae penetrations
        Speaker: Chris Adolphsen
        Slides
      • 14
        Coupler Diameter, Multipacting and Tunability
        Surveys pros and cons of different coupler choices
        Speaker: Chris Adolphsen
      • 15
        Waveguide Heat Loads
        Size and implications for CFS and LLRF
        Speaker: Chris Nantista
        Slides
      • 16
        LLRF Requirements
        Includes discussion of desired overhead and HLRF bandwidth
        Speaker: Brian Chase
        Slides
      • 10:20
        Coffee Break
      • 17
        CFS Requirements
        Includes a discussion of how the linac alignment requirements (both spatial and temporal) should be specified for installation and site evaluation
        Speaker: Tom Lackowski
        Slides
      • 18
        Cryogenic Issues
        Includes discussion of layout and input required from other groups
        Speaker: Tom Peterson
        Slides
      • 19
        Quad Field and Position Stablity
        Review of short and long term quad stability requirements and implications for the support system
        Speaker: Chris Adolphsen
        Slides
    • Lunch
    • Cost and Design Optimization
      • 20
        General Cost Model and Gradient and Gradient Spread Dependence
        Speaker: Chris Adolphsen
        Slides
      • 21
        Example Tradeoff: Additional Cryo Cost vs Savings from Removing 5K Shield
        Speaker: Tom Peterson
        Slides
      • 14:30
        Coffee Break
      • 22
        Main Linac Cost Summary, Drivers and Technical and Cost Risks
        Speaker: Tetsuo Shidara
      • 23
        MLI Meeting Comments
        Speaker: Nick Walker
        Slides