27–28 Sept 2007
FNAL
GMT timezone

Session

Integration Issues

3
28 Sept 2007, 09:00
Fish Tank (FNAL)

Fish Tank

FNAL

Wilson Hall 13th floor

Description

This session is to allow people to present issues than span technical groups, including CFS and LLRF

Presentation materials

There are no materials yet.

  1. Chris Adolphsen
    28/09/2007, 09:00
    Includes proposal for reducing wake offsets due to asymmetric antennae penetrations
    Go to contribution page
  2. Chris Adolphsen
    28/09/2007, 09:20
    Surveys pros and cons of different coupler choices
    Go to contribution page
  3. Chris Nantista
    28/09/2007, 09:40
    Size and implications for CFS and LLRF
    Go to contribution page
  4. Brian Chase
    28/09/2007, 10:00
    Includes discussion of desired overhead and HLRF bandwidth
    Go to contribution page
  5. Tom Lackowski
    28/09/2007, 10:50
    Includes a discussion of how the linac alignment requirements (both spatial and temporal) should be specified for installation and site evaluation
    Go to contribution page
  6. Tom Peterson
    28/09/2007, 11:10
    Includes discussion of layout and input required from other groups
    Go to contribution page
  7. Chris Adolphsen
    28/09/2007, 11:30
    Review of short and long term quad stability requirements and implications for the support system
    Go to contribution page
Building timetable...