Focus on:  Hide Contributions
  • Indico style
  • Indico style - inline minutes
  • Indico style - numbered
  • Indico style - numbered + minutes
  • Indico Weeks View
  • LCC style

Choose timezone

Your profile timezone:
Use timezone based on:
Login

3.9GHz Engineering meeting

6 August 2007
US/Central timezone
  • Overview
  • Timetable
  • Contribution List

Contribution List

9 / 9
0. RRR test results on "drop offs" from cells 3, 5 and 7 of AES-001
Cooley
06/08/2007, 09:00
1.3 GHz
8. Plans to have JLab X-ray NbTi used on AES cavity flanges
Foley
06/08/2007, 09:15
1.3 GHz
9. Requirement for inclusion of attachment rings on single-cell cavities -- Americanization of DESY drawings
06/08/2007, 09:30
1.3 GHz
3. Status of cavities 7 and 8
Foley
06/08/2007, 09:40
3.9 GHz
4. Single-cell cavity fabrication status and plans
Foley
06/08/2007, 09:50
3.9 GHz
10. Helium vessel issues -- material and welder certification -- procedure -- testing, etc.
Helen, Mitchell, Champion, etc
06/08/2007, 10:00
3.9 GHz
5. Single-cell cavity test results
Genfa
06/08/2007, 10:15
3.9 GHz
6. Plasma processing plan for 3.9 GHz
Genfa
06/08/2007, 10:25
3.9 GHz
7. 1.5 GHz single-cell cavity from "bad" material
Genfa
06/08/2007, 10:35
OTHER BUSINESS

Back to the event

Indico
Powered by Indico v3.3.9-pre
  • Help
  • Contact