      Status of SSR1 fabrication at IUAC, India
      Speaker: P. Prakash
      Slides
    • 2
      News from cavity testing
      Speaker: Genfa Wu
      Slides
    • 3
      Discussion on Cavities for CM2
      The plan is to discuss: a) which cavities should go into CM2, b) the schedule of Cavity dressing, c) the schedule of horizontal test of these cavities and impact of MDB cryo shutdown on HTS. d) a possible revised schedule of CM2 and cavities for S1 global.
      Speaker: Shekhar Mishra and Harry Carter