24–27 Oct 2011
Universe
Europe/Berlin timezone

Scientific Programme

This workshop represents the second comprehensive Baseline Technical Review, following on from the Damping Ring BTR held in INFN Frascati in July. The main goal of the BTRs is to formally establish a consensus baseline for the ILC TDR. The workshop will cover four Accelerator Systems:
  1. Electron source
  2. Positron source
  3. RTML (including bunch compressor)
  4. BDS and MDI (including detector hall)
The review will in general focus on the following themes:
  • Parameters, lattice and layout
  • Technical systems (magnets, power supplies, RF, vacuum etc.)
  • Key technologies (R&D, with a view to down-select if required)
  • CFS requirements and specifications
  • Cost.
In addition to these general themes, key issues specific to individual accelerator systems will be addressed. A particular emphasis will be placed on formal documentation, ready for inclusion in EDMS.