ATF2 2nd goal meeting

Asia/Tokyo
ATF meeting room (container) (KEK, remote)

ATF meeting room (container)

KEK, remote

Description
1. Major subjects are listed below; KNU (S. Jang) : design of reference cavity - aperture, tuning method of frequency simulation of DAQ with 100MHz digitizer (SIS3301) and integrated ADCs plan of resolution study at IP wakefield estimation - location of the reference cavity in collaboration with A.Lyapin et al. LAL : test of piezo movers (BPM1&2) - PI mover (BPM3) was tested relative stability between two movers, i.e. between BPM1&2 and BPM3 (update) shipment plan of the IP-chambers FONT : performance study (IP-feedback) definition of inputs for the IP-feedback KEK : preparation of flanges with feedthrous scheduling the installation and any hardware updates if needed 2. Suggestions (1) 9+1 inputs for the IP-feedback (slide-4) (2) 2 optimum configurations, where the new IP is IPBPM-B or IPBPM-C (3) wakefied effects were estimated by two methods, i.e. Collimator and K.Bane's calculation (4) the wakefield estimation prefers the IP at IPBPM-B and a taper structure in front of IPBPM-A to reduce its effect further.
FJPPL-FKPPL Workshop on ATF2 Accelerator R&D, LAL, 19-20 March 2012
Fuze meeting info.
    • 16:00 16:20
      Progres of IPBPM 20m
      Speaker: Mr Siwon Jang (KNU)
      Slides
    • 16:20 16:40
      Progress of the new IP chamber system 20m
      Speakers: Frédéric Bogard (LAL), Philip Bambade (Laboratoire de l''Accelerateur Lineaire (LAL) (IN2P3) (LAL)), Mr Sandry WALLON (LAL-CNRS)
      Transparents
    • 16:40 17:00
      Progress of IP feedback 20m
      Speakers: Dr Glenn Christian (John Adams Institute of Accelerator Science, University of Oxford), Prof. Philip Burrows (Oxford University), Dr YOUNGIM KIM (University of Oxford)
    • 17:00 17:20
      Status at KEK 20m
      Speaker: Nobuhiro Terunuma (KEK)
    • 17:20 18:00
      Discussion