Skip to main content

ATF2 IP Tuning Task Group Meeting

Asia/Tokyo
Glen White (SLAC)
Description
Co-ordination and reporting of efforts to develop and test tuning algorithms for obtaining and maintaining the goal 35nm IP spot size.
    • 17:00 17:10
      RMS vs. Gaussian core IP size determination 10m
      differences in tuning behaviour when looking at a numerical RMS description of the beam size and fitting a gaussian to the core and using the calculated width
      Speaker: Dr Glen White (SLAC)
      Slides
      * Agreed for now, RMS measurement of IP beamsize probably most representative of the measurement made by the Shintake Monitor and should be used as the input for tuning simulations. * Around the target region of ~35nm, there appears to be a good correlation of RMS versus gaussian fitted core beam sizes, this correlation gets worse for larger beamsizes, presumably where larger non-linear terms dominate and generate a larger tail to the beam profile. * Kuroda-san suggested comparing a measurement of the RMS with a truncated distribution to the gaussian fit. * Results of simulations tuning with RMS compare well with those tuning with gaussian core- RMS case is slightly better in fact. Did not show any results of tuning time with the 2 cases- need to do for next time. * Problem Rogelio showed where beam size does not reduce below ~35nm for pushed beta case still not resolved- we would perhaps need some direct measurement of the core here, which is probably impossible?
    • 17:10 17:25
      Tuning Simulation updates 15m
      Simulation details and results with improved sextupole multiknobs
      Speaker: Dr Glen White (SLAC)
      Slides
    • 17:25 17:35
      Goals and schedule for task group 10m
      Planning to achieve a presentation of agreed tuning algorthims and cross-checked simulations thereof by Dec ATF2 meeting
      Speaker: Dr Glen White (SLAC)
      Slides