Minutes
16:00
→
16:10
Status of the remaining 800 PCA16 preamp chips (pupose: produce a time schedule)
10m
16:10
→
16:20
Status of mounting the 40 MHz ALTRO's onto the FEC
10m
16:20
→
16:30
Test results of the first 200 PCA16 preamp chips (purpose: decide on performance limits for acceptance)
10m
16:30
→
16:40
Results of the FEC system tests (version 2) (purpose: decide whether reference voltages of ALTRO fixed/variable)
10m
more information
Slides
16:40
→
16:50
Status of readout units (RCU, SIU, DCS and DRORC) and of firmware needed for >10MHz readout
10m
16:50
→
17:00
Status of the distributor box, integration with beam trigger, and distribution of 40 MHz clock to RCU's
10m
Slides
17:00
→
17:10
Mechanics and first impressions from cooling tests
10m
Slides