EUDET/LCTPC electronics meeting
Thursday 21 Aug 2008, 16:00
→
17:30
Europe/Zurich
4-1-021
4-1-021
Lucie Linssen
(
CERN
)
Minutes
1
Status of the remaining 800 PCA16 preamp chips (pupose: produce a time schedule)
2
Status of mounting the 40 MHz ALTRO's onto the FEC
3
Test results of the first 200 PCA16 preamp chips (purpose: decide on performance limits for acceptance)
4
Results of the FEC system tests (version 2) (purpose: decide whether reference voltages of ALTRO fixed/variable)
more information
Slides
5
Status of readout units (RCU, SIU, DCS and DRORC) and of firmware needed for >10MHz readout
6
Status of the distributor box, integration with beam trigger, and distribution of 40 MHz clock to RCU's
Slides
7
Mechanics and first impressions from cooling tests
Slides