SRF R&D March 30, 2009

Europe/Zurich
    • 09:30 09:45
      Status of SSR1 fabrication at IUAC, India 15m
      Speaker: P. Prakash
      Slides
    • 09:45 10:00
      News from cavity testing 15m
      Speaker: Genfa Wu
      Slides
    • 10:00 10:30
      Discussion on Cavities for CM2 30m
      The plan is to discuss: a) which cavities should go into CM2, b) the schedule of Cavity dressing, c) the schedule of horizontal test of these cavities and impact of MDB cryo shutdown on HTS. d) a possible revised schedule of CM2 and cavities for S1 global.
      Speaker: Shekhar Mishra and Harry Carter
      Slides