(1) New extraction line tuning (coupling and dispersion
correction) We must
evaluation and decide the strength of the skew
quadrupoles for the tuning.
(2) Recent ATF2 FF optics (modified quadrupole position
at last project
meeting).
We must fix the final ATF2 FF optics.
(3) BBA and optics diagnostics. I believe many
collaborators are interested
in
this study item. We need to start the preparation of the
optics diagnostics.
(4) Beam size tuning without Shintake monitor. Since
the dynamic range of
Shintake monitor is less than few hundred nm beam
size, we must make
the
beam size less than sub-micron w/o Shintake monitor.
This item is one of
the
important issues for ATF2 commissioning.
(5) Final beam size tuning.
(6) International collaborations.
Production and Installation Policy (1)
Production and Installation Policy (2)
Production status and Installation Policy (3)
get togther in front of 3-gokan
(1) New extraction line tuning (coupling and dispersion correction) We must
evaluation and decide the strength of the skew quadrupoles for the tuning.
(2) Recent ATF2 FF optics (modified quadrupole position at last project meeting).
We must fix the final ATF2 FF optics.
(3) BBA and optics diagnostics. I believe many collaborators are interested in
this study item. We need to start the preparation of the optics diagnostics.
(4) Beam size tuning without Shintake monitor. Since the dynamic range of
Shintake monitor is less than few hundred nm beam size, we must make the
beam size less than sub-micron w/o Shintake monitor. This item is one of the
important issues for ATF2 commissioning.
(5) Final beam size tuning.
(6) International collaborations.
(1) Stability - GM, supports and Monalisa
(2) Support table, mover and alignment
Japanese Restrant
for FONT, MonaLisa, Stable(CLIC) Table, Laser-wire, nBPM, IPBPM and IPBSM etc.
about 12 minutes to each sub-component, and
about 30 minutes for discussion of the global schedule and to highlight any
scheduling conflicts
summaries of each sessions by the conveners