Organization and Charges of Cryomodule and Cryogenics
Speaker:
A. Yamamoto
Slides
3
Definition of work area between groups
clarify the interface between the groups
Speaker:
N. Ohuchi
Slides
4
Basic strategy of designing cryomodule
unified cryomodule design or compatible cryomodule design
Speaker:
H. Hayano
Slides
10:20
Coffee break
5
Status report and work package plan of US
review of RDR work, present situation and work package plan of US
Speaker:
H. Carter
Slides
6
Status report and work package plan of Asia
review of RDR work, present situation and work package plan of Asia (Japan)
Speaker:
N. Ohuchi
Slides
12:05
Lunch
7
Type 4 cryomodule design work
review of T4CM design and present activity
Speaker:
D. Mitchell
Slides
8
Construction experience of LHC dipole cryostats
cryostat design principles, description of main cryostat components,industrial production of cryostat components, assembly of the cryostat at CERN, cryostat performance
Speaker:
V. Parma
Slides
15:15
Coffee break
9
Drawing up the work and R&D list for EDR
making the list of working items from the WPs of three regions
Speaker:
H. Carter/N. Ohuchi
17:00
Break
10
connection to PISA via Webex
Industrialization plan at XFEL : C. Pagani
scheduled time can be changed
Status report and work package plan of Europe : TBD
review of RDR work, present situation and work package plan of Europa
review of the cryomodule cost for RDR, and guide-line for EDR
Speaker:
R. Stanek
Slides
12
Industrialization of cryomodule for EDR
Speaker:
R. Kephart
Slides
10:30
Coffee break
13
Review of the cryogenic system RDR work
Speaker:
T. Peterson
Slides
14
Work package plan of cryogenic system for EDR
including the overlap between cryomodule and cryogenic system designs
Speaker:
T. Peterson
Slides
12:15
Lunch
15
Cryogenic experience from CERN LHC
construction and operation experience of the LHC cryogenic system,
and preliminary results for measured system static heat loads.
Speaker:
L. J. Tavian
Slides
14:30
Coffee break
16
Work sharing between three regions
including vacuum pump system for beam line, BPM-Quad package, special cold
gate valve, HOM absorber, vacuum break, aligmnent issue, transportation,
installation