Construction experience of LHC dipole cryostats¶1h
cryostat design principles, description of main cryostat components,industrial production of cryostat components, assembly of the cryostat at CERN, cryostat performance
Industrialization plan at XFEL : C. Pagani
scheduled time can be changed
Status report and work package plan of Europe : TBD
review of RDR work, present situation and work package plan of Europa
including vacuum pump system for beam line, BPM-Quad package, special cold
gate valve, HOM absorber, vacuum break, aligmnent issue, transportation,
installation