Cryomodules & Cryogenics - KOM

GMT
KEK Build.4 1F Seminar hall (KEK)

KEK Build.4 1F Seminar hall

KEK

Co-hosted by H. Hayano, N. Ohuchi and T. Peterson
Description


For webex meeting: click here

For EDR KOM at KEK: click here

For Pictures: click here

    • 09:00 09:10
      Introductory talk -- toward EDR 10m
      Speaker: B. Barish
      Slides
    • 09:10 09:26
      Organization and Charges of Cryomodule and Cryogenics 16m
      Speaker: A. Yamamoto
      Slides
    • 09:26 09:50
      Definition of work area between groups 24m
      clarify the interface between the groups
      Speaker: N. Ohuchi
      Slides
    • 09:50 10:20
      Basic strategy of designing cryomodule 30m
      unified cryomodule design or compatible cryomodule design
      Speaker: H. Hayano
      Slides
    • 10:20 10:35
      Coffee break 15m
    • 10:35 11:20
      Status report and work package plan of US 45m
      review of RDR work, present situation and work package plan of US
      Speaker: H. Carter
      Slides
    • 11:20 12:05
      Status report and work package plan of Asia 45m
      review of RDR work, present situation and work package plan of Asia (Japan)
      Speaker: N. Ohuchi
      Slides
    • 12:05 13:30
      Lunch 1h 25m
    • 13:30 14:15
      Type 4 cryomodule design work 45m
      review of T4CM design and present activity
      Speaker: D. Mitchell
      Slides
    • 14:15 15:15
      Construction experience of LHC dipole cryostats 1h
      cryostat design principles, description of main cryostat components,industrial production of cryostat components, assembly of the cryostat at CERN, cryostat performance
      Speaker: V. Parma
      Slides
    • 15:15 15:30
      Coffee break 15m
    • 15:30 17:00
      Drawing up the work and R&D list for EDR 1h 30m
      making the list of working items from the WPs of three regions
      Speaker: H. Carter/N. Ohuchi
    • 17:00 18:00
      Break 1h
    • 18:00 19:30
      connection to PISA via Webex 1h 30m
      Industrialization plan at XFEL : C. Pagani scheduled time can be changed Status report and work package plan of Europe : TBD review of RDR work, present situation and work package plan of Europa
    • 09:00 09:45
      Cost estimation of cryomodule for EDR 45m
      review of the cryomodule cost for RDR, and guide-line for EDR
      Speaker: R. Stanek
      Slides
    • 09:45 10:30
      Industrialization of cryomodule for EDR 45m
      Speaker: R. Kephart
      Slides
    • 10:30 10:45
      Coffee break 15m
    • 10:45 11:30
      Review of the cryogenic system RDR work 45m
      Speaker: T. Peterson
      Slides
    • 11:30 12:15
      Work package plan of cryogenic system for EDR 45m
      including the overlap between cryomodule and cryogenic system designs
      Speaker: T. Peterson
      Slides
    • 12:15 13:30
      Lunch 1h 15m
    • 13:30 14:30
      Cryogenic experience from CERN LHC 1h
      construction and operation experience of the LHC cryogenic system, and preliminary results for measured system static heat loads.
      Speaker: L. J. Tavian
      Slides
    • 14:30 14:45
      Coffee break 15m
    • 14:45 16:45
      Work sharing between three regions 2h
      including vacuum pump system for beam line, BPM-Quad package, special cold gate valve, HOM absorber, vacuum break, aligmnent issue, transportation, installation
      Speaker: All
    • 08:30 08:45
      Agreement for EDR work 15m
      Speaker: S. Mishra
      Slides
    • 08:45 09:45
      Time line and mile stone of work package for EDR 1h
      Speaker: R. Stanek
      Slides
    • 09:45 10:45
      Break & STF Tour 1h
    • 10:45 11:15
      Making summary of the meeting 30m
      Speaker: H. Hayano/N. Ohuchi/T.Peterson
      Slides
    • 11:15 11:20
      Closeout 5m
      Speaker: A. Yamamoto