ILC European Regional Meeting and ILC-BDIR
→
Europe/Zurich
Royal Holloway
Royal Holloway
-
-
ELAN Plenary and News I
- 1
- 2
- 3
-
10:30
Coffee
-
Welcome Reception
-
-
-
Beam optics and layout I ALT1-- (Arts)
ALT1--
Arts
- 15
- 16
- 17
- 18
-
Diagnostics and Feedback I G24-- (Arts)
G24--
Arts
- 19
- 20
- 21
- 22
-
ILC SCRF I ALT2-- (Arts)
ALT2--
Arts
-
23
Introduction to the WGOutline of the WG Agenda - Preparation for SnowmassSpeaker: Lilje, Lutz (DESY)
- 24
- 25
- 26
-
10:00
coffee
-
23
-
Laser Wire Mini Workshop I G3A-- (Arts)
G3A--
Arts
- 27
- 28
- 29
- 30
-
Diagnostics and Feedback II G24-- (Arts)
G24--
Arts
- 31
- 32
- 33
-
34
DiscussionSpeaker: All
-
Extraction line, final focus and LET ALT1-- (Arts)
ALT1--
Arts
- 35
- 36
- 37
- 38
- 39
-
Laser Wire Mini Workshop II G3A-- (Arts)
G3A--
Arts
- 43
- 44
-
45
First thoughts on Electro Optic scanningSpeaker: A. Bosco (RHUL)
- 46
- 47
-
Collimation and Detector Backgrounds I ALT1-- (Arts)
ALT1--
Arts
- 48
- 49
- 50
-
51
Collimation system studiesSpeaker: Ilya Agapov/Grahame Blair
- 52
- 53
- 54
- 55
-
ILC SCRF III ALT2-- (Arts)
ALT2--
Arts
- 56
- 57
- 58
-
15:30
coffee
-
Collimation and Detector Backgrounds II ALT1-- (Arts)
ALT1--
Arts
- 59
- 60
- 61
- 62
-
ILC SCRF V ALT2-- (Arts)
ALT2--
Arts
-
64
Development of R&D issues presentation for SnowmassDiscussion (ctd.)
-
64
-
-
-
Diagnostics and Feedback III G24-- (Arts)
G24--
Arts
- 69
- 70
- 71
- 72
-
LET Beam Dynamics I ALT2-- (Arts)
ALT2--
Arts
- 76
- 77
- 78
- 79
- 80
- 81
-
10:00
coffee
-
Diangnostics and Feedback IV G24-- (Arts)
G24--
Arts
- 82
- 83
- 84
- 85
- 86
- 87
-
Extraction and Dumps II + Final Focus Optics II ALT1-- (Arts)
ALT1--
Arts
- 88
- 89
- 90
- 91
-
ATF2 I ALT1-- (Arts)
ALT1--
Arts
- 95
- 96
- 97
- 98
- 99
- 100
- 101
-
102
discussionSpeaker: all
-
Damping Rings I ALT2-- (Arts)
ALT2--
Arts
- 103
- 104
- 105
- 106
-
15:00
coffee
-
Metrology and Stabilisation I G34-- (Arts)
G34--
Arts
- 107
- 108
- 109
- 110
-
Polarised Positron Source I G3A-- (Arts)
G3A--
Arts
- 111
- 112
- 113
- 114
-
Damping Rings II ALT2-- (Arts)
ALT2--
Arts
- 115
- 116
- 117
- 118
- 119
- 120
-
Metrology and Stabilisation II G34-- (Arts)
G34--
Arts
- 121
- 122
- 123
-
Polarised Positron Source II G3A-- (Arts)
G3A--
Arts
- 124
- 125
- 126
-
ATF2 II ALT1-- (Arts)
ALT1--
Arts
- 127
- 128
- 129
- 130
- 131
- 132
- 133
-
134
DiscussionSpeaker: All
-
Simulation Standards and Interfacing G3A-- (Arts)
G3A--
Arts
The main goal of the meeting is
1) Definition of the draft accelerator description format
2) Agreement on the usage of Grid resources- 135
-
136
ILC RepositorySpeaker: G. White (QMUL/SLAC)
- 137
- 138
-
139
DiscussionSpeaker: All
-
Workshop Dinner
-
-
-
-
EUROTeV Steering Committee Meeting Tolansky-1-T125
Tolansky-1-T125
Royal Holloway
At this meeting each WP leader will present the goals of their WP and the written proposals of the individual work packages will be finalised.
-