Performances of a fast, full-scale, CMOS pixel sensor with integrated zero-suppression and its evolution towards ultra-light double-sided ladders for the ILD vertex detector.¶20m
Speaker:
DrRita De Masi(IRES)
Slides
10:50
DEPFET technology for the ILC: Achievements, latest results and future plans¶30m
Joint: BDS + IR (See IR schedule for links to talks)¶5m
(1) Impact of Travelling Focus & Strawman Baseline 2009 Changes to MDI -- Andrei Seryi
(2) Progress on Push-Pull IR Studies -- Marco Oriunno
(3) Compact SC Quad Prototype Plans & DID Status -- Brett Parker
(4) QD0/QF1 Design Update -- Andy Marone
(1) Vibration analysis of the ILD QD0-support system Hiroshi Yamaoka
(2) Vibration Studies for SiD Marco Oriunno
(3) Recent Vibration Measurements (TBC)
Joint session with Beam Dynamics & IR (See IR agenda for links to talks)¶5m
(1) IP Feedback System Prototyping and Design, Phil Burrows
(2) Expected Performance of IP FB System at ILC, Glen White
(3) Vacuum requirements in the detector region from Beam Gas and other considerations, Takashi Maruyama
(4) Update on vacuum modelling, Oleg Maleshev
webex information
13:30
→
15:30
GDE: Beam Dynamics: BDS - IR - Beam Dynamics Joint¶Luminaria
Luminaria
The University of New Mexico
The Student Union Building.
webex information, Friday afternoon
webex information, Thursday morning
13:30
Joint with BDS and IR (see agenda of "Detectors: Interaction Region Backgrounds, Forward Detectors" Group)¶2h
13:30
→
15:30
GDE: CFS: Single Tunnel Linac Issues with ML, HLRF, and Cost Mgmt.¶Santa Ana A